← Fleetpoint
AC frame · In production

Fleetpoint AC

Base-power group charging for vehicles parked overnight or for a work shift.

The AC frame is assembled for each site. The number of charge points and their power are sized by how much energy is available on site and how long the vehicles stay parked. Delivered ready-made and installed above ground.

Fleetpoint AC
Example configurations

The configuration depends on the energy available.

4 charge points
4 × Type 2 · 44 / 88 kW
8 charge points
8 × Type 2 · 88 / 176 kW
10 charge points
10 × Type 2 · 11 kW / point
Fleetpoint AC
Best suited for
  • Vans and delivery fleets
  • Staff and shared cars
  • Properties and car parks