The second generation of electrification requires a new approach.
The first generation built in concrete. The second generation moves with the fleet. AICG is built for exactly this shift.
You want to electrify — but you're stuck.
The plot is leased
Fixed infra stays on the landlord's ground when operations move. The investment is written off.
The grid connection isn't enough
Your fleet arrives now — but a grid upgrade takes years or costs too much. The fleet stands still.
The yard changes, the fleet grows
Fixed infra locks you into this moment. Every change demands new excavation.
The first generation
Guaranteed supply, heavy construction.
Focused on sites where power and customer traffic were already secured. Solutions required heavy investment.
- →Project work
- →Excavation
- →Permits
- →Lock-in
The second generation
Expanding needs require new degrees of freedom.
Electrification is expanding to new industries and areas — leased plots, seasons, changing fleets. Traditional concrete-bound infra does not bend to this.
- →Modular
- →Movable
- →Turnkey
- →Scalable
The differences, briefly.
| Feature | 1st generation | 2nd generation · Fleetpoint |
|---|---|---|
| Delivery time | Months | 30 minutes |
| Excavation | Required | Not needed |
| Building permit | Required | Not needed |
| Movability | Not possible | Full |
| Scalability | New project | Module by module |
| Procurement model | Ownership only | Rental · hybrid · ownership |
| Fit for leased plots | Does not fit | Fits |
Three freedoms.
Freedoms you haven't seen before.
Freedom to change
Your investment isn't stuck in the ground.
- →No excavation, no foundations
- →Moves with your operations
- →For short- and long-term use
Freedom from the grid
You don't wait years for the DSO.
- →Runs on your existing connection
- →BESS buffer flattens power peaks
- →Immediate deployment — in days
Financial freedom
CapEx turns into OpEx.
- →No heavy upfront investment
- →Monthly fee — equipment and service included
- →No balance sheet burden